Upstream Developments

A study has been carried out over the last two years to examine how to develop the Zengamina project for future requirements.

A site survey and a hydrological study has been done. The final report has been drafted, together with a detailed plan from our electrical engineer Brian Woodcock.

This study has indicated a series of three stages to develop the hydro up to a maximum of about 2.5 Megawatts when the time is right in the future.